-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
372KN Force Vibro Hammer For Solar Construction Piling Pulling

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Concrete Pile Driver | Feature | Fast Moving Technology For Fast Working Project |
---|---|---|---|
Vibration | 3200 Rpm | Pressure | 32 Mpa |
Centrifugal Force | 372 KN | Max Piling Length | 12 Meter |
Arm | 670kg | Hammer | 2300kg |
Material | Steel, Core Materials Are All Imported | Type | Hydraulic Vibrating Hammer |
Color | Yellow/Blue/Red/White, Customized Color Available | Condition | New And Used Both Available |
Highlight | Concrete Pile Driving Vibro Hammer,Pulling Concrete Pile Driving Equipment,Solar Construction Vibro Hammer |
372KN force vibro hammer for solar construction projects piling and pulling
Description
VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.
Why VIBRA?
- 11 years in this business
- more than 1000 users
- Almost 500 sets sell per year
- Have customers who are using it for than 3 years without having any problem
Features
VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.
With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
Q: How to order?
A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.