-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
Hydraulic Vibro Hammer For 10 Meter Sheet Pile Driving Construction Projects

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Excavator Mounted Pile Driver::Piling And Pulling | Feature | Low Noise Fast Operation |
---|---|---|---|
Operation Pressure | 32Mpa | Hammer Weight | 1700kg |
Arm Weight | 500kg | Max.Pile Length | 10m |
Centrifugal Force | 265kn | Vibration Frequency | 2800rpm |
Material | Steel, Core Materials Are All Imported | Color | Blue/Yellow/Red/White, Customized Color Available |
HS Code | 8430100000 | Type | Hydraulic Vibrating Hammer |
Highlight | Hydraulic Sheet Pile Driving Vibro Hammer,Construction Hydraulic Pile Hammer,10 Meter Sheet Piling Vibro Hammer |
Vibro hammer for 10 meter sheet pile driving construction projects
Larsen steel sheet pile retaining always the first choose! Whether construction, irrigation, sewage treatment, and now floods, strong Larsen steel sheet pile can be perseverance does not fall in the water! And do Larsen steel sheet pile cofferdam is environmentally friendly construction speed, low construction costs, time-sensitive!
Features
- Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
- Quick converting operation; Applied to various working environments.
- Compared to other systems, less force required for pile pulling
- Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
- Not damage the building even often work near it.
- Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short;It is helpful to overcome environmental problems.
- According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
- Hydraulic motor has small volume and light weight, but it can output high power and high speed.
- Vibration frequency can be adjusted by variable pump. It can be used in excavator operation of any brand, and can meet different work requirements only after changing chucks.
Working Principle
Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.
The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.
Machinery Characteristics
- The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
- The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
- Mini and light weight design make application flexible.
- Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
- The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: One set is available.
Q: What's the payment method?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!