-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
Excavator Mounted Large Vibro Hammer For Sheet Pile Driving Project Work

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Large Sheet Pile Driver Vibro Hammer | Feature | Capable Of Driving Long Piles In Hard Soil Condition |
---|---|---|---|
Frequency | 3200 Rpm | Pressure | 32 Mpa |
Arm | 820 Kg | Hammer | 3350 Kg |
Centrifugal Force | 585 KN | Excavator | 55-70 T |
Color | Blue/Yellow/Red/White, Customized Color Available | Material | Steel, Core Materials Are All Imported |
Maximum Piling Depth | 21 Meter | HS Code | 8430100000 |
Highlight | Sheet Pile Driving Vibro Hammer,Excavator Mounted Sheet Pile Driving Machine |
Excavator mounted large vibro hammer for sheet pile driving project work
Sheet piles are sections of sheet steel with interlocking edges that are driven into the ground to provide earth retention and excavation support. Vibratory hammers are often used to install sheet piles. On building projects sheet piling is often adopted to provide temporary retention of very deep local elements of the foundation, for example core or lift overruns. On civil projects sheet piling is commonly used for tunnel portals and in marine locations for riverbank protection, seawalls, cofferdams etc. VIBRA PCF 500 fitted with XCMG 660DP excavator for driving 12-meter sheet piles in the Asia’s largest paper mill sewer pipe project in Zhangzhou city, Fujian, China. VIBRA pile driver handled correctly the value of sheet piles to a project so that the ability to use and re-use them is ensured.
In order to lead the market development trend, our company has successively developed two large pile driving hammerheads, PCF-500 and PCF-600, which are respectively matched on the main engine with a dead weight of 60 tons ~78 tons to meet the construction requirements of 18 meters ~24 meters steel sheet pile, steel guard cylinder and PC pile.
PCF-500 is suitable for matching in the overall body weight of 60~68 tons excavator, engine power in 320~345kw, hydraulic pump maximum flow in 760L.
Technical highlights
- New electric control system, prolong the service life of components, large flow confluence valve, the flow is increased to 700L, the body pipeline is increased to 1 1/2 inches.
- Super structural parts, increase the connection shaft, ensure the force balance of each part, no weakness.
- Box bearing self-lubricating system, effectively extend the service life of bearings, ensure core stability.
- Super strong cast steel chuck, matching 160 cylinder, 30Mpa pressure clamping force can reach 602KN, stable and reliable clamping.
- Strong vibration power, with the original imported Parker motor, SKF bearings from Sweden and high-end gear components.
Technical Parameter
itemmodel | PCF-500 |
Eccentric weight (kg) | 77.5 |
Eccentric moment (kgm) | 9.2 |
Exciting force (kN) | 828 |
No-load amplitude (mm) | 9.3 |
Arm weight (kg) | 820 |
Hammer head weight (kg) | 3600 |
Excavator (T) | 60~68 |
Maximum Piling Depth (m) | 21 |
FAQ
Q: Are you a manufacturer?
A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,
Q: Who is your main customer?
A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!