-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
Sheet Piling Pulling Excavator Mounted Pile Driver 18 Meter 535KN

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Large Excavator Mounted Sheet Pile And Pull | Feature | Fast Moving Technology For Fast Working Project |
---|---|---|---|
Vibration Frequency | 3300 Rpm | Operation Pressure | 32 Mpa |
Hammer Weight | 3150 Kg | Arm Weight | 820 Kg |
Max.Pile Length | 18 M | Centrifugal Force | 535 Kn |
Excavator | 47~55 Ton | HS Code | 8430100000 |
Material | Steel, Core Materials Are All Imported | Type | Hydraulic Vibrating Hammer |
Color | Blue/Yellow, Customized Color Available | Condition | New And Used Both Available |
Highlight | 18 Meter Excavator Vibro Hammer,Pulling Excavator Mounted Pile Driver,Sheet Piling Pulling Vibro Hammer |
535KN Vibro hammer for 18 meter sheet piling and pulling work
Description
This series of machines are very popular with customers. The structure of the box body is consistant with that of the mainstream Taiwan hammer. The spare parts are interchangable. The box bearing is easy to maintain. The fabricated box structure has higher requirements for material strength, welding process and machine acccuracy. We have strict controll in all aspects of manufacturing to ensure stable quality. We also have successfully manufactured the largest model pcf-500 which fitted with CAT-365.
Machinery Characteristics
- The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
- The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
- Mini and light weight design make application flexible.
- Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
- The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice
Technical Parameter
Item Model | PCF-300 | PCF-330 | PCF-350 | PCF-450 | PCF-500 | |
Vibration Frequency | rpm | 3500 | 3300 | 3500 | 3300 | 3200 |
Operation Pressure | Mpa | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force | kn | 385 | 420 | 470 | 535 | 585 |
Max. Pile Length | m | 12 | 12 | 15 | 18 | 21 |
Arm Weight | kg | 750 | 750 | 750 | 820 | 820 |
Hammer Weight | kg | 2750 | 2850 | 2950 | 3150 | 3350 |
Excavator | T | 27~30 | 33~38 | 40~45 | 47~55 | 55~70 |
About Us
YeKun Construction Machinery is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: One set is available.
Q: What's the payment method ?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!