-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
12m Hard Soil Condition Excavator Mounted Vibratory Sheet Pile Hammer

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Photovoltaic Pile Driver | Feature | Suitable For Any Brand Of Excavator |
---|---|---|---|
Arm Weight | 500kg | Operation Pressure | 32Mpa |
Hammer Weight | 1900kg | Vibration Frequency | 2800rpm |
Centrifugal Force | 335KN | Excavator | 20-30T |
Piling Depth | 12m, Till 15m In Case Of Soft Soil | HS Code | 8430100000 |
Material | Steel, Core Materials Are All Imported | Color | Blue/Yellow, Customized Color Available |
Type | New And Used Both Available | ||
Highlight | 12m vibratory sheet pile equipment,Photovoltaic vibratory sheet pile hammer,12m excavator sheet pile driver |
Description
Vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.
Advantages
High vibration frequency, large vibration force, high strength of the structural parts;
Super-heavy cast steel fixture, increase the oil cylinder and connecting rod, high reliability.
The machine has high configuration, German Rexroth vibration motor, the core components are imported first-line brands.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
YeKun Construction Machinery is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment. L/C will be accepted upon order above 35,000$
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!