-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
18m Heavy Civilized Construction Hydraulic Screw Pile Driver Stable

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xFrequency | 3300 Rpm | Pressure | 32 Mpa |
---|---|---|---|
Centrifugal Force | 535 Kn | Maximum Pile | 18 M |
Weight Of Arm | 820 Kg | Weight Of Hammer | 3150 Kg |
Excavator Operating Weight | 47~55 T | ||
Highlight | Heavy Construction hydraulic pile driver,18m hydraulic screw pile driver,18m Construction screw pile driver |
About US
Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.
Product Details
This series of machines are popular with customers. The structure of the body is look like with that of the standard Taiwan hammer. The spare parts are replaceable. The box bearing is broken and easy to be kept up. The box structure has higher necessities for material strength, welding process and machining accuracy. We have extreme control in all pieces of manufacturing to ensure stable quality. We have viably manufactured the greatest model pcf-500, which matches with Cat 365.
Item Model | PCF-300 | PCF-330 | PCF-350 | PCF-450 | PCF-500 | |
Vibration Frequency | rpm | 3500 | 3300 | 3500 | 3300 | 3200 |
Operation Pressure | Mpa | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force | kn | 385 | 420 | 470 | 535 | 585 |
Max. Pile Length | m | 12 | 12 | 15 | 18 | 21 |
Weight of Arm | kg | 750 | 750 | 750 | 820 | 820 |
Weight of Hammer | kg | 2750 | 2850 | 2950 | 3150 | 3350 |
Excavator | T | 27~30 | 33~38 | 40~45 | 47~55 | 55~70 |
Equipment Advantage
-
- Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
- Quick converting operation; Applied to various working environments.
- Compared to other systems, less force required for pile pulling
- Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
- Not damage the building even often work near it.
- Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
- According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
FAQ
Q: What about warranty period?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: One set is available.
Q: What's the payment method?
A: We accept L/C, T/T and D/P payment. L/C will be accepted for the order above USD 35,000.
Q: What is the delivery time?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can. Let us know during order placement.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!