Amphibious Excavator Mounted Pile Driver Sheet Vibro Machine High Precision

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Hydraulic Pile Driving Equipment | Feature | Stable Running |
---|---|---|---|
Operation Pressure | 30 Mpa | Arm Weight | 260 Kg |
Hammer Weight | 1100 Kg | Vibration Frequency | 2500 Rpm |
Centrifugal Force | 172 Kn | Excavator | 12~17 Ton |
Highlight | Amphibious sheet vibro machine,Excavator Mounted sheet vibro machine,Amphibious precision vibratory pile driver |
Amphibious Excavator Mounted Pile Driver YEKUN
Land and/or water capable excavator mounted pile drivers are broadly and proficiently utilized in water conservancy projects, digging of streams and lakes in metropolitan and rustic development, asset advancement of swamps and mudflats, and ecological remediation.
Land and/or water capable excavator mounted pile driver is a sort of multi-reason excavator which is appropriate for the delicate ground and shallow water climate. The voyaging gadget embraces a multi-body drifting tank structure and a fixed box molded track shoe, which can securely walk and work on the mud and water surface. The reinforced very long working arm and effective turning system guarantee the activity quality and exhuming productivity of the piling. The extensive driving space and compact general media cautioning framework work on the accommodation and solace of activity. The logical and sensible coordinating of the high-level water driven framework and the force framework gadget can undoubtedly understand the composite activity and guarantee the solidarity of high productivity and high economy.
Features
- Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
- Quick converting operation; Applied to various working environments.
- Compared to other systems, less force required for pile pulling
- Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
- Not damage the building even often work near it.
- Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
- According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
Technical Parameter
Item | FV-150 | FV-250 | FV-280 | FV-300 | FV-330 |
Vibration Frequency (rpm) | 2500 | 2500 | 2800 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 30 | 32 | 32 | 32 |
Centrifugal Force (KN) | 172 | 265 | 335 | 350 | 372 |
Max.Pile Length (m) | 8 | 10 | 12 | 12 | 12 |
Arm Weight (kg) | 260 | 500 | 500 | 670 | 670 |
Hammer Weight (kg) | 1100 | 1700 | 1900 | 2100 | 2300 |
Excavator (T) | 12~17 | 20-30 | 20-30 | 30-35 | 33-40 |
About Us
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2009, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment. L/C payment method is applicable for order more than USD 35,000.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!