Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
Kobelco Excavator Mounted Pile Driver For All Kinds Of Piling

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Larsen Driving Sheet Pile Driver | Vibration Frequency | 3200 Rpm |
---|---|---|---|
Operation Pressure | 32 Mpa | Hammer Weight | 2600 Kg |
Arm Weight | 750 Kg | Max.Pile Length | 15 M |
Centrifugal Force | 455 Kn | Excavator | 40~45 Ton |
Highlight | Kobelco Excavator Mounted Pile Driver,45ton Excavator Mounted Pile Driver,Larsen Driving Sheet Pile Driver |
Kobelco Excavator Mounted Pile Driver For All Kinds Of Piling
Our Service
We can offer professional technical supports and good after sale service for your orders.
We have a stronger R&D team who can develop and produce the special machines according to your requests.
Features
- Pile driving steel sheet pile, RC pile, steel rail pile, iron plate, H steel
- Fast changing over activity; Applied to different work spaces.
- Compared with different frameworks, less power needed for pile pulling
- Not harm the top or lower part of steel pipe pile, steel plate pile and steel rail pile.
- Not harm the structure even frequently work close to it.
- Embraced rubber sheath to lessen commotion and vibration, the activity is peaceful and the functioning period is short; It is useful to defeat natural issues.
- As indicated by the situation bearing of sheet pile and site conditions, the sheet pile can be cinched or brought down by sure and negative turn of 180 °. The vibration recurrence can be changed by two levels, and the two-level twofold siphons are joined to significantly build the excitation power.
- Water driven engine has little volume and light weight, yet it can yield high force and rapid.
- Vibration recurrence can be changed by factor siphon. It very well may be utilized in backhoe activity of any brand, and can meet diverse work necessities solely after evolving tosses.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Shanghai yekun Machinery Co., Ltd was founded in 2014 A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: How long is the warranty period?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: 1 set is available.
Q: What's the payment method?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 10-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!