-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Pile Driver
-
Mini Excavator Pile Driver
-
Sheet Pile Driving Machine
-
Concrete Pile Driving Equipment
-
Vibratory Hammer Pile Driver
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
360 Degree Pile Driver
-
Four Eccentric Pile Driver
-
Photovoltaic Pile Series
-
Side Clamp Pile Driver
Embraced Elastic Sheath 10m 30T Pile Driver Excavator Attachment

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Excavator Mounted Pile Driver | Color | Blue |
---|---|---|---|
Vibration Frequency | 2800rpm | Operation Pressure | 32Mpa |
Hammer Weight | 1700kg | Arm Weight | 5000kg |
Max.Pile Length | 10m | Centrifugal Force | 265Kn |
Excavator | 20-30 Ton | Hanging Amplitude | 6mm |
Eccentric Moment | 2.5kgm | ||
Highlight | 30T Excavator Mounted Pile Driver,30T pile driver excavator attachment,10m pile driver excavator attachment |
Features
- Embraced Elastic sheath to decrease clamor and vibration, the operation is calm and the working period is short;It is accommodating to overcome natural problems.
- Agreeing to the situation course of sheet heap and location conditions, the sheet heap can be clamped or brought down by positive and negative revolution of 180 °. The vibration recurrence can be balanced by two levels, and the two-level twofold pumps are combined to significantly increment the excitation force.
- Pressure driven engine has little volume and light weight, but it can yield tall control and tall speed.
- Vibration recurrence can be balanced by variable pump. It can be utilized in excavator operation of any brand, and can meet diverse work necessities as it were after changing chucks.
- Heap driving steel sheet heap, cement heap, steel rail heap, press plate, H steel
- Speedy changing over operation; Connected to different working environments.
- Compared to other frameworks , less drive required for heap pulling
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Shanghai yekun Machinery Co., Ltd was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: Did you provide any warranty ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: Minimum Order Quantity is 1 set.
Q: What's the payment method ?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!